Duplex basket strainers
Twin bodies with changeover pipework; operation depends on the reviewed valves, flow path and cleaning plan.

AI-enhanced reference views of similar equipment. Actual configuration follows the agreed specification.
Product overview
Twin bodies with changeover pipework; operation depends on the reviewed valves, flow path and cleaning plan.
- Product family
- Duplex basket strainers
- Selection priorities
- Duty, filtration elements, dimensions, materials, interfaces and service conditions
Working principle
Two filter units are connected by pipework. Series, parallel and changeover arrangements serve different purposes; valves and routing determine operation.
Construction & flow path
Two basket bodies are connected by changeover piping. Valves, isolation and flow routing determine whether one side can run while the other is serviced.
Applications & filtration duty
A direction for reducing cleaning shutdowns in pipeline protection. Continuous-operation capability requires an agreed changeover configuration.
Technical parameters
Use these specifications for selection. Materials, dimensions and operating conditions follow the selected model and agreed specification.
Selection information
- Fluid & viscosity
- Operating flow (m³/h)
- Operating / design pressure (MPa)
- Operating / design temperature (°C)
- Connection size & standard (DN / in)
- Differential pressure & service trigger (MPa)
- Dimensions & service clearance (mm)
Model and configuration notes
Configuration for your applicationShare the fluid, filtration goal, operating conditions and installation requirements. Existing models, nameplates or drawings help us review the configuration.
Information to prepare for an inquiry
Use this family’s selection priorities to share available operating conditions, equipment information or drawings.
- Provide a flow diagram and state any uninterrupted-changeover requirement.
- Review one-side capacity, pressure loss and isolation.
- Define changeover valves, vent/drain arrangements and service space.
Operation & maintenance
Before opening, replacing elements or disassembly, stop and isolate under the equipment procedure, depressurize, drain and confirm zero pressure. Follow the actual valve sequence, confirm the serviced body is depressurized and inspect both baskets and changeover seals.
Common operating inputs
- Fluid and major composition
- Target flow and operating pattern
- Operating temperature and pressure
- Contaminant form and target rating
- Material, connection and space constraints
- Maintenance frequency and existing equipment
Discuss this product’s configuration
Share the fluid, operating and installation conditions to review suitable specifications.
Products can be configured around the actual duty. Final specifications follow the quotation, drawing or technical agreement confirmed by both parties.
Related products
Y-type pipeline strainers
A cleanable screen captures pipeline debris; selection considers flow, pressure drop and orientation.
Learn moreT-type pipeline strainers
A T-type body with a cleanable screen, configured around the flow path and service clearance.
Learn moreBasket strainers
A removable basket captures solids for pipeline protection and scheduled cleaning.
Learn more